Costa Rica vs Côte d'Ivoire: Public private partnerships investment in energy

Costa Rica
46.00 million current US$
in 2016
Côte d'Ivoire
60.68 million current US$
in 2024
Costa Rica rank
50th
Côte d'Ivoire rank
48th

Public private partnerships investment in energy over time

  • Costa Rica
  • Côte d'Ivoire
0200.0M400.0M600.0M800.0M199020072024

How they compare

Côte d'Ivoire currently reports 60.68 million current US$ against 46.00 million current US$ in Costa Rica, a difference of 14.68 million current US$.

That makes Côte d'Ivoire's figure about 1.3 times Costa Rica's.

The two have swapped places 2 times across 6 shared years of data; in 1994 it was Côte d'Ivoire ahead.

Costa Rica ranks 50th and Côte d'Ivoire ranks 48th of 63 countries.

Across the 2 decades both report, Costa Rica averaged higher in 1 and Côte d'Ivoire in 1.

Head to head by decade

Decade Costa Rica Côte d'Ivoire Difference Ahead
1990s 25.50 million current US$ 145.40 million current US$ 119.90 million current US$ Côte d'Ivoire
2010s 284.53 million current US$ 223.00 million current US$ 61.53 million current US$ Costa Rica

Averages of every year both report within each decade.

Frequently asked questions

Which has higher public private partnerships investment in energy, Costa Rica or Côte d'Ivoire?
Côte d'Ivoire, at 60.68 million current US$ against 46.00 million current US$ in Costa Rica as of 2024.
What is the difference in public private partnerships investment in energy between Costa Rica and Côte d'Ivoire?
14.68 million current US$, with Côte d'Ivoire ahead.
How many years of comparable data are there for Costa Rica and Côte d'Ivoire?
6 years are reported by both, from 1994 to 2014.
How do Costa Rica and Côte d'Ivoire rank globally for public private partnerships investment in energy?
Costa Rica ranks 50th and Côte d'Ivoire ranks 48th of 63 countries.
Where does this data come from?
Private Participation in Infrastructure Project Database, World Bank (WB), published as Public private partnerships investment in energy (current US$). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Costa Rica vs Côte d'Ivoire: Public private partnerships investment in energy. Statizoid, drawing on Private Participation in Infrastructure Project Database, World Bank (WB). Retrieved 11 September 2026, from https://infrastructure.statizoid.com/compare/public-private-partnerships-investment-in-energy-current-us/costa-rica/cote-d-ivoire/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://infrastructure.statizoid.com/compare/public-private-partnerships-investment-in-energy-current-us/costa-rica/cote-d-ivoire/">Costa Rica vs Côte d'Ivoire: Public private partnerships investment in energy</a> — Statizoid

About this data

Indicator
Public private partnerships investment in energy (current US$)
Unit
current US$
Source
Private Participation in Infrastructure Project Database, World Bank (WB)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
82 places, 1,358 data points, 1984–2024
Last refreshed

The Private Participation In Infrastructure (PPI) Database records contractual arrangements for public infrastructure projects in low- and middle-income countries (as classified by the World Bank) that have reached financial closure, in which private parties assume operating risk. Public private partnerships in energy refers to commitments to infrastructure projects in energy (electricity and natural gas: generation, transmission, and distribution) that have reached financial closure and directly or indirectly serve the public. The types of projects included are management and lease contracts, brownfield projects, and greenfield projects (in which a private entity or a public-private joint venture builds and operates a new facility). Divestitures and merchant projects are excluded. Investments are classified as one of two types: (1) Investments in physical assets: resources the project company commits to invest in expanding and modernizing facilities and (2) Payments to the government: to acquire state-owned enterprises or rights to provide services in a specific area or to use radio spectrum. Data is presented based on investment year. Data are in current U.S. dollars.